RCONG585: Third Itemized Amount That Exceeds $100,000 and Exceed 25% of All Other Liabilities Measured at Fair Value on a Recurring Basis (Rc-q 13.) - Level 3 Fair Value Measurements
RCONG585 is the call report code for third itemized amount that exceeds $100,000 and exceed 25% of all other liabilities measured at fair value on a recurring basis (rc-q 13.) - level 3 fair value measurements, reported on Schedule RC-Q, Assets and Liabilities Measured at Fair Value on a Recurring Basis. For Q2 2026, 22 banks reported it, totaling $9.2M. The largest value reported for Q2 2026 was $9.2M, by Parkway Bank and Trust Company.
Definition
Disclose each component of all other liabilities, and the dollar amount of such component, that is greater than $100,000 and exceeds 25 percent of the amount reported in Schedule RC-Q, item 13, column E. Describe the component in Memorandum item 2.e (TEXT G581).
Source: Federal Reserve Micro Data Reference Manual (MDRM). The FFIEC call report instructions remain the authority on how to report the item.
Where RCONG585 sits on the call report
| Code | RCONG585 (prefix RCON, item G585) |
|---|---|
| Prefix RCON | Domestic offices. Banks without foreign offices (FFIEC 041 and 051 filers) report their whole balance sheet in RCON items. |
| Schedule | RC-Q, Assets and Liabilities Measured at Fair Value on a Recurring Basis |
| Reported on | FFIEC 041 |
| Value | Dollar amount, reported in thousands, as of the quarter end |
| In the MDRM since | 2009 |
The same item under other prefixes
Item G585 is also reported under these codes. Which banks file each one depends on the form they file.
| Code | Meaning of the prefix | Banks reporting |
|---|---|---|
| RCFDG585 | The consolidated bank, domestic and foreign offices, reported by FFIEC 031 filers (banks with foreign offices) | 44 |
Largest reported values, Q2 2026
| Bank | Headquarters | RCONG585 |
|---|---|---|
| Parkway Bank and Trust Company | Harwood Heights, IL | $9.2M |
Total reported by quarter
| Quarter end | Banks reporting | Total reported |
|---|---|---|
| June 30, 2026 | 22 | $9.2M |
| March 31, 2026 | 22 | $9.2M |
| December 31, 2025 | 23 | $13.6M |
| September 30, 2025 | 23 | $13.6M |
| June 30, 2025 | 24 | $13.6M |
| March 31, 2025 | 23 | $13.6M |
| December 31, 2024 | 23 | $13.6M |
| September 30, 2024 | 23 | $13.6M |
Related
All codes on Schedule RC-Q · All call report schedules · Find the code for a loan type · What a call report is