Skip to main content
Call report code · Schedule RC-Q

RCFDG539: All Other Assets (Itemize and Describe Amounts Included in Schedule Rc-q, Item 6, That Are Greater Than $100,000 and Exceed 25% of Item 6): Mortgage Servicing Rights - Level 2 Fair Value Measurements

RCFDG539 is the call report code for all other assets (itemize and describe amounts included in schedule rc-q, item 6, that are greater than $100,000 and exceed 25% of item 6): mortgage servicing rights - level 2 fair value measurements, reported on Schedule RC-Q, Assets and Liabilities Measured at Fair Value on a Recurring Basis. For Q2 2026, 44 banks reported it, totaling $0.

Definition

Report Mortgage servicing assets, that is greater than $100,000 and exceeds 25 percent of the amount reported in Schedule RC-Q, item 6, column D.

Source: Federal Reserve Micro Data Reference Manual (MDRM). The FFIEC call report instructions remain the authority on how to report the item.

Where RCFDG539 sits on the call report

Reference facts for call report code RCFDG539
CodeRCFDG539 (prefix RCFD, item G539)
Prefix RCFDThe consolidated bank, domestic and foreign offices, reported by FFIEC 031 filers (banks with foreign offices).
ScheduleRC-Q, Assets and Liabilities Measured at Fair Value on a Recurring Basis
Reported onFFIEC 031
ValueDollar amount, reported in thousands, as of the quarter end
In the MDRM since2009

The same item under other prefixes

Item G539 is also reported under these codes. Which banks file each one depends on the form they file.

CodeMeaning of the prefixBanks reporting
RCONG539 Domestic offices. Banks without foreign offices (FFIEC 041 and 051 filers) report their whole balance sheet in RCON items 38

Total reported by quarter

Sum of RCFDG539 across the banks that reported it, by quarter
Quarter endBanks reportingTotal reported
June 30, 202644$0
March 31, 202645$0
December 31, 202544$0
September 30, 202544$0
June 30, 202541$0
March 31, 202541$0
December 31, 202441$0
September 30, 202441$0

Related

All codes on Schedule RC-Q · All call report schedules · Find the code for a loan type · What a call report is