Call report code RCFDB858: Amortized cost of held-to-maturity asset-backed securities, other
RCFDB858 is the call report code for amortized cost of held-to-maturity asset-backed securities, other, reported on Schedule RC-B, Securities. For Q3 2026, 50 banks reported it, totaling $832.6M; the median among the 2 with a nonzero amount was $416.3M. The largest value reported for Q3 2026 was $778.0M, by City National Bank.
Definition
Report in column A the amortized cost of all held-to-maturity asset-backed securities collateralized by non-mortgage loans other than those described in Schedule RC-B, items 5.a through 5.e, above, i.e., loans as defined for Schedule RC-C, part I, items 2, 3, and 7 through 9, lease financing receivables as defined for Schedule RC-C, part I, item 10, and all other assets.
Source: Federal Reserve Micro Data Reference Manual (MDRM). The FFIEC call report instructions remain the authority on how to report the item.
Where RCFDB858 sits on the call report
| Code | RCFDB858 (prefix RCFD, item B858) |
|---|---|
| Prefix RCFD | The consolidated bank, domestic and foreign offices, reported by FFIEC 031 filers: banks with foreign offices, banks with $100 billion or more in total assets, and advanced approaches banks. |
| Schedule | RC-B, Securities |
| Reported on | FFIEC 031 |
| Value | Dollar amount, reported in thousands, as of the quarter end |
| In the MDRM since | 2001 |
The same item under other prefixes
Item B858 is also reported under these codes. Which banks file each one depends on the form they file.
| Code | Meaning of the prefix | Banks reporting |
|---|---|---|
| RCONB858 | Domestic offices. Banks without foreign offices (FFIEC 041 and 051 filers) report their whole balance sheet in RCON items | 98 |
Largest reported values, Q3 2026
| Bank | Headquarters | RCFDB858 |
|---|---|---|
| City National Bank | Los Angeles, CA | $778.0M |
| Pinnacle Bank | Nashville, TN | $54.6M |
Total reported by quarter
| Quarter end | Banks reporting | Total reported |
|---|---|---|
| September 30, 2026 | 50 | $832.6M |
| June 30, 2026 | 50 | $602.2M |
| March 31, 2026 | 50 | $412.6M |
| December 31, 2025 | 49 | $247.2M |
| September 30, 2025 | 49 | $54.8M |
| June 30, 2025 | 49 | $168.8M |
| March 31, 2025 | 50 | $228.7M |
| December 31, 2024 | 51 | $346.1M |
Related